Guide
Autoclave Records And Audit Readiness: A Practical Checklist For QC And Testing Labs
Alsin Technology Services · Updated 21 November 2026
What you must keep depends on your quality system, your accreditation body and your regulator. Follow your own procedures. This checklist covers what most labs keep on file for an autoclave.
Instrument Documents
- IQ and OQ documents supplied with the instrument.
- Calibration certificates. For ELETOM79 autoclaves, third-party calibration certificates, either NABL or non-NABL, are provided for the sensors and the PID controller.
- Factory test and final inspection report, and the user manual.
PQ is not in the list of documents we supply. If your procedures need performance qualification for your own loads, plan it with your quality team.
Records For Every Cycle
- Date, time and operator.
- What was loaded and the programme or set values used.
- The temperature record for the cycle, any alarms, and the indicator results your procedure requires.
What The Pt Series Records
The Pt Series stores date and time stamped process values and events in its own memory: start, air valve closing, sterilisation start and end, reset, stop, door opening, alarms, parameter changes and the final F0 value. Optional PC software adds reports in PDF and Excel, an audit trail and access control by authority level.
Logs To Keep
- Calibration dates, with the next due date.
- Service, AMC and breakdown visits.
- Failed cycles and the action taken.
- Who may run the autoclave and change its settings.
Need records for audits? Ask about the Pt Series or talk to our team.
Tell Us What You Sterilise
Share your load and your lab’s power supply. We will recommend a model and send a quote.
Request a quoteChat on WhatsApp