ELETOM79 laboratory instruments · Karnataka dealer, Bengaluru+91 9071262002support@alsin.inWhatsAppCertifications
Get a quote

Guide

How To Choose A Muffle Furnace For Ashing And Heat Treatment

Alsin Technology Services · Updated 22 November 2026

A muffle furnace heats a small chamber to a high temperature. The catalogue lists ashing and loss-on-ignition tests, determining ash content of food, feed and materials, calcination and heat treatment of small parts, and testing ceramics, glass and metals. Five points narrow down the choice.

1. Match The Size To Your Samples

There are three models, EAML-4, EAML-6 and EAML-9, with 2, 7 and 23 litre chambers. Compare the inner muffle size, given in inches, with your crucibles and samples.

ModelInner muffle W × D × H (inch)CapacityPower
EAML-44 × 9 × 42 L2500 W, single phase 230 VAC
EAML-66 × 12 × 67 L4500 W, three phase 440 VAC
EAML-99 × 18 × 923 L7500 W, three phase 440 VAC

2. Check The Power Supply

EAML-4 runs on a single phase 230 VAC supply. EAML-6 and EAML-9 need a three phase 440 VAC supply. If your lab has no three-phase supply, that points to EAML-4, unless the manufacturer confirms another configuration. Actual power values depend upon the site voltage rating.

3. Check The Temperature And Accuracy

The furnaces run from ambient +7 °C to 1000 °C, with 0.1 °C resolution and ±3 °C accuracy. A 2-wire dual K-type thermocouple with ceramic isolation senses the temperature.

4. Plan Your Heating Programmes

A built-in 16-step ramp and soak profile controller sets the heating programme, with an optional 64-step controller. Each step can be set from 0 to 9999 minutes. After a power failure you can choose whether the furnace resumes or aborts. A large sunlight-readable jumbo display shows the process, and the Au Series furnace lists 21 CFR compliance software. Ask us to confirm it for the model you choose.

5. Know The Safety Features

A dual sensor and a door sensor protect the user, and a heavy-duty latch locks the door securely. A double-walled body with multi-layer ceramic insulation keeps heat dissipation negligible, and a factory-set auto electrical cut-off digital thermostat limits the temperature. Each furnace comes with one pair of SS tongs and one pair of high thermal insulating hand gloves.

The furnaces are made in the Au Series only.

Delivery, Installation And Warranty

Installation and operator training are included in the price. The warranty covers parts and labour, but not consumables, and runs for 1 year from installation or 15 months from the invoice date, whichever ends earlier. An optional 12-month AMC is available (see the service terms). Delivery takes 4 to 6 weeks from the date of advance payment. Every model is also available as -SS and -GMP versions. Documents supplied: IQ and OQ documents and third-party calibration certificates for the sensors and the controller, either NABL or non-NABL.

See the ELETOM79 muffle furnaces page for the features, models and the full specification table. Tell us your application and we will recommend a model.

Related guides: Hot air oven up to 200 °C or 300 °C: which should you choose?, How to choose a vacuum oven, How to choose a laboratory incubator, or the vertical autoclave capacity guide.

Tell Us About Your Application

Share what you need to run and your lab’s power supply. We will recommend a model and send a quote.

Request a quoteChat on WhatsApp